ABC Form C-13 August 2001
TO: STATE OF ALABAMA
BUILDING COMMISSION
770 Washington Avenue, Suite 444
Montgomery, AL 36130-1150
(334) 242-4082 FAX (334) 242-4182
CERTIFICATE OF SUBSTANTIAL COMPLETION
ROUTING PROCEDURES ON REVERSE SIDE |
BC# _________________________ |
Substantial Completion has been achieved for
the following portion of the Work _________
________________________________________________________________________________________________________
_______________________________________________________________________________________________________.
The Date of Substantial Completion of the Work covered by this certificate is established to be.
"Substantial Completion" means the designated Work is sufficiently complete, in accordance with the Contract Documents, such that the Owner may occupy or utilize the Work for its intended use without disruption or interference by the Contractor in completing or correcting any remaining unfinished Work. The Date of Substantial Completion is the date upon which all warranties for the designated Work commence, unless otherwise agreed and recorded herein.
Punch List: A page list of items to be completed or corrected prior to the Owner’s approval of Final Payment is attached
hereto, but does not alter the Contractor’s responsibility to complete or correct all Work in full compliance with the Contract Documents. The Contractor shall complete or correct all items on the attached list, ready for re-inspection for Final Acceptance,
within 30 days after the above Date of Substantial Completion, unless another date is stated here:.
If completed or corrected within this period, warranties of these items commence on the Date of Substantial Completion, otherwise such warranties commence on the date of Final Acceptance of each item.
Only one (1) originally executed substantial completion form should be routed for signature. B.C. office will forward the original to the Owner and provide copies to all other parties.
RECOMMENDED BY:
ARCHITECT: __________________________________________________________________
CONTRACTING PARTIES:
CONTRACTOR _______________________________________________________________
OWNER ______________________________________________________________________
_______________________________________________________________________
APPROVALS:
BUILDING COMM.INSPECTOR: _________________________________________________
BUILDING COMM. CHIEF INSPECTOR: __________________________________________
BUILDING COMM. DIRECTOR: _________________________________________________
Page 1 of 1
DATE: ______________
DATE:_______________
DATE:_______________
DATE:_______________
DATE:_______________
DATE:_______________
DATE: ______________
CERTIFICATE OF SUBSTANTIAL
COMPLETION
ROUTING PROCEDURE
Only one (1) originally executed substantial completion form should be routed for signature. B.C. office will forward the original to the owner and provide copies to all other parties.
ARCHITECT/ENGINEER: Please forward to Contractor after signature and date. Please provide Owner with local B.C. Inspector’s name & home address.
CONTRACTOR: Please forward to Owner after signature and date.
OWNER: Please forward to local B.C. Inspector’s home address after signature and date. You may contact B.C. office at (334) 242-4082 if B.C. Inspector’s name/address is needed.
B.C. INSPECTOR: Will forward document to B.C. office for review and distribution.
NOTICE
THE EXECUTED “GENERAL CONTRACTOR’S ROOFING GUARANTEE” (ABC Form C-9) AND ANY OTHER ROOFING WARRANTY REQUIRED BY THE CONTRACT MUST ACCOMPANY THIS CERTIFICATE TO OBTAIN ABC APPROVAL.