The 81 611A form is a crucial document for anyone looking to secure an electrical permit in the City of Philadelphia. This application, managed by the Department of Licenses and Inspections, requires detailed information about the proposed construction site, including the address, the owner’s contact details, and the electrical contractor’s credentials. Specific aspects to be filled out include the type of construction—whether it is new, an addition, or an alteration—as well as the area of work and its estimated cost. The form also highlights the need for the licensed inspection agency to be identified and provides options for different types of work that may be performed, such as communications systems or fire alarms. Applicants must disclose if their application relates to a violation and certify the accuracy of the information provided. Understanding and completing the 81 611A form accurately is essential, as it lays the groundwork for legal compliance with Philadelphia’s building codes and ordinances.

81 611A Example

APPLICATION FOR

CITY OF PHILADELPHIA

ELECTRICAL PERMIT

DEPARTMENT OF LICENSES AND INSPECTIONS

MUNICIPAL SERVICES BUILDING - CONCOURSE

APPLICATION # __________________________________________

1401 JOHN F. KENNEDY BOULEVARD

PHILADELPHIA, PA 19102

(Please complete all information below and print clearly)

For more information visit us at www.phila.gov/li

ADDRESS OF PROPOSED CONSTRUCTION:

LOCATION WITHIN BUILDING (FLOOR, SPACE NUMBER, ETC.):

OWNER:

OWNER PHONE #:

EMAIL:

 

ELECTRICAL CONTRACTOR:

 

 

 

CONTRACTOR’S ADDRESS:

 

 

 

 

 

 

 

 

 

 

 

COMPANY NAME:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHONE #

FAX #

 

LICENSE #

EMAIL:

 

ARCHITECT/ENGINEER IN RESPONSIBLE CHARGE:

 

ARCHITECT/ENGINEERING FIRM ADDRESS:

 

 

 

 

 

 

 

 

 

ARCHITECT/ENGINEERING FIRM:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHONE #

FAX #

 

LICENSE #

EMAIL:

 

LICENSED INSPECTION AGENCY:

 

 

 

 

 

 

NEW CONSTRUCTION ADDITION

ALTERATION / REHABILITATION

AREA OF WORK SPACE

SQ.FT.

ESTIMATED COST

$

NUMBER OF FLOORS IN BUILDING

USE OF BUILDING SPACE

ONE - OR -TWO - FAMILY DWELLING HEALTH CARE FACILITY

OTHER (DESCRIBE BELOW):

FUEL DISPENSING FACILITY

HAZARDOUS LOCATION (ARTICLES 500-503)

EQUIPMENT

< 600 VOLTS

> 600 VOLTS

CAPACITY

<400 AMPS OR 100 KW > 400 AMPS OR 100 KW

TYPE OF WORK (SELECT ALL THAT APPLY)

COMMUNICATIONS SYSTEMS (DESCRIBE BELOW)

FIRE ALARM

REPLACE OR RELOCATE DEVICES ON EXISTING APPROVED FIRE ALARM SYSTEM (EXCLUDING MAIN PANEL)

NEW INSTALLATION

ALTERATION TO EXISTING SYSTEM (DESCRIBE BELOW)

 

 

ELECTRICAL

 

ELECTRICAL SERVICE

REPLACEMENT OF EQUIPMENT IN KIND WITH NO ADDITIONAL WIRING

TEMPORARY USE OF PORTABLE WIRING (FOR CARNIVAL OR EVENT)

TEMPORARY ELECTRIC WORK FOR CONSTRUCTION SITE

OTHER WORK NOT LISTED ABOVE (DESCRIBE BELOW)

BRIEF DESCRIPTION OF WORK:

IS THIS APPLICATION IN RESPONSE TO A VIOLATION?

NO

YES

VIOLATION #:

All provisions of the Philadelphia Building Construction and Occupancy Code and other City ordinances will be complied with, whether specified herein or not. Plans approved by the Department form a part of this application. I hereby certify that the statements contained herein are true and correct to the best of my knowledge and belief. I further certify that I am authorized by the owner to make the foregoing application, that the owner has selected the licensed inspection agency identified above and that, before I accept my permit for which this application is made, the owner shall be made aware of all conditions of the permit. I understand that if I knowingly make any false statement herein I am subject to such penalties as may be prescribed by law or ordinance.

APPLICANT’S SIGNATURE: ___________________________________________________________________________________________ DATE: _____/_____/________

81-611 A (Rev. 8/15)

Form Characteristics

Fact Name Description
Form Purpose The 81 611A form is used to apply for an electrical permit in the City of Philadelphia. This form is necessary for various electrical work, including new installations and alterations.
Governing Authority The application is governed by the Philadelphia Building Construction and Occupancy Code, which contains regulations that must be followed.
Application Information Applicants must fill out detailed information about the proposed construction, including the location, owner, contractor, and scope of work.
Types of Work The form accommodates various types of electrical work, such as new installations, alterations to existing systems, and temporary electrical work for events.
Compliance Requirement The applicant certifies compliance with all related city ordinances and acknowledges that plans approved by the Department are part of the application.
Violations Applicants must disclose if the permit application is in response to a violation, providing a violation number if applicable.

Guidelines on Utilizing 81 611A

Filling out the 81 611A form for an electrical permit is a straightforward process. This application captures essential details about your project and helps ensure compliance with local regulations. After you complete the form, it will be submitted to the City of Philadelphia's Department of Licenses and Inspections for review.

  1. Obtain the form: Download the 81 611A form from the city website or acquire a physical copy from the Department of Licenses and Inspections.
  2. Fill out the application number: Write the application number if it has been assigned to you.
  3. Provide the address: Enter the address of the proposed construction site. Ensure the details are clear and accurate.
  4. Location within the building: Specify the exact location in the building, such as the floor or space number.
  5. Owner's information: Fill in the owner's name, phone number, and email address.
  6. Contractor details: Add the electrical contractor's name, address, phone number, fax number, license number, and email address.
  7. Architect/Engineer info: If applicable, include the name of the architect or engineer responsible for the project along with their firm address, phone number, fax number, license number, and email.
  8. Select the licensed inspection agency: Indicate the agency that will inspect the work.
  9. Project type: Choose from new construction, addition, or alteration/rehabilitation.
  10. Describe the area of work: Enter the total area in square feet and estimated cost of the project.
  11. Building details: State the number of floors in the building and the intended use (e.g., residential, healthcare facility).
  12. Type of work: Select all applicable types of work. Be sure to describe any communications systems or other specifics if necessary.
  13. Provide details of the work: Briefly describe the electrical work being done, including any alterations or temporary wiring needs.
  14. Indicate if responding to a violation: Answer whether this application is a response to a violation and provide the violation number if applicable.
  15. Certification: Read the certification statement carefully, then sign and date the application to confirm accuracy and authorization.

After completing all steps, review the form for any errors or omissions. Once satisfied, submit it to the Department of Licenses and Inspections. Keep a copy for your records, as it may be needed later in the permitting process.

What You Should Know About This Form

What is the Purpose of the 81 611A Form?

The 81 611A form is an application for obtaining an electrical permit for construction projects in the City of Philadelphia. It is a necessary document that informs the Department of Licenses and Inspections about the intended electrical work, including new constructions, alterations, and any significant electrical installations or modifications. This ensures compliance with the city’s building codes and safety regulations.

Who Should Fill Out the 81 611A Form?

The form should be completed by the property owner or a designated representative, such as a licensed electrical contractor or an architect/engineer in charge of the project. It’s important that the information is accurate and complete to facilitate the permit approval process. The owner must also authorize the application, indicating trust in the chosen licensed inspection agency.

What Information Must Be Provided on the Form?

When filling out the form, applicants need to provide detailed information about the proposed construction site, including the address, the type of work being done, and the estimated cost of the project. Additionally, details about the electrical contractor, responsible architect/engineer, and licensed inspection agency must be included. Accurate descriptions of the work and compliance with local codes are essential.

How Do I Submit the 81 611A Form?

Applicants can submit the form to the Department of Licenses and Inspections either in person at the Municipal Services Building or through the specified online channels. It's crucial to ensure that all sections are filled out completely and clearly, as incomplete applications may delay the permitting process.

What Happens After Submission?

Once the 81 611A form is submitted, the Department will review the application to ensure that it complies with city regulations. If everything is in order, the permit will be issued, allowing construction to proceed. If there are any issues, the applicant may be contacted for clarifications or additional information. The approval process can vary in time based on the complexity of the project.

What If My Application Is in Response to a Violation?

If the application is addressing a violation, the applicant must indicate this on the form and provide the violation number. This is important, as it highlights the need for the permit to resolve any pending issues with compliance. Following the regulations will help avoid additional penalties and ensure that all electrical work meets necessary safety standards.

Common mistakes

Filling out the 81 611A form for an electrical permit in Philadelphia can be straightforward, but many applicants make mistakes that can delay the process. One common error is failing to complete all required sections. Each part of the form is essential, and leaving any field blank can result in a rejection of the application. Ensure that all requested information, from the address of the proposed construction to the contractor details, is filled out completely.

Another mistake is not printing the information clearly. If the text is hard to read, it can cause confusion. This may lead to errors in processing the application. Using legible handwriting or filling out the form digitally can help avoid this issue. It’s also important to check that there are no typos in critical areas like names and addresses, as even small errors can create significant problems.

Applicants often forget to include accurate contact information for themselves or the electrical contractor. Providing a phone number and email address is necessary for effective communication throughout the permitting process. If the city has questions regarding the application, it needs a way to reach the applicant without delay.

Ignoring the specific requirements for each type of work is another common oversight. The form requires applicants to specify whether they are conducting new work, alterations, or repairs. Adding this detail ensures the city understands the scope of the project and can respond appropriately. Failing to do so may result in needing additional information later on, slowing down permit approval.

Not indicating whether the application is a response to a violation can also lead to complications. If this applies to your case, it's crucial to check "YES" and provide the violation number. This helps the city officials address any existing compliance issues promptly.

Another frequent mistake is not reviewing the application before submission. Many applicants submit their forms without double-checking the information included. A careful review can catch any mistakes or omissions that might derail the application process.

Additionally, many forget to sign the application. The section for the applicant’s signature is vital. Without it, the application may not be considered valid. Always ensure that the signature is present before turning in the form.

Lastly, submitting the form without the appropriate fees is a common blunder. It’s essential to check the fee structure and make the necessary payments to avoid delays in processing. Confirming the payment details beforehand can smooth the application process.

Documents used along the form

The 81 611A form, used to apply for an electrical permit in the City of Philadelphia, is often accompanied by several other important forms and documents. Each serves a specific purpose in the permitting process and can help facilitate the project’s approval. Here’s a list of documents frequently submitted along with the 81 611A form.

  • Electrical Plans: Detailed diagrams showing the electrical layout, including outlets, switches, and wiring. These must comply with local codes and illustrate the proposed electrical work.
  • Application for Construction Permit (Form 81 611): This form is for general construction permits that may be needed in addition to the electrical permit, especially for larger projects.
  • Inspection Agency Agreement: A document that outlines the agreement between the property owner and the licensed inspection agency responsible for overseeing the project’s compliance with codes.
  • Certificate of Insurance: Proof of insurance for the contractor to ensure that there is coverage for any potential accidents or liabilities that may arise during the project.
  • Architectural Plans: If applicable, these detailed documents provided by the architect outline the overall design and layout of the building, including electrical considerations.
  • Land Use Approval: A form indicating that the proposed construction meets local zoning requirements and has received the necessary approvals for land use.
  • Utility Company Approvals: Documentation from the utility provider confirming that they are aware of and have approved the new electrical work, if necessary.
  • Disclosure Statement of Violation: If there are existing violations, this form discloses those issues and outlines steps to rectify them before proceeding with the new application.

Having all the necessary forms and documents ready when applying for an electrical permit can streamline the process and help avoid delays. Make sure to check for any specific requirements that may apply to your particular project in Philadelphia.

Similar forms

The 81 611A form is an application for an electrical permit in Philadelphia. Several other documents serve similar purposes in different contexts or jurisdictions. Below are four examples:

  • Building Permit Application: This document is required for new constructions, renovations, or significant alterations to existing structures. Like the 81 611A, it gathers essential information about the project and ensures compliance with local building codes.
  • Electrical Plan Review Application: This form is required to submit detailed electrical plans for review before construction begins. Similar to the 81 611A, it ensures that all electrical work adheres to safety standards and regulatory requirements.
  • Mechanical Permit Application: This application covers the installation or modification of mechanical systems within a building. Both this application and the 81 611A require details on the scope of work and compliance with city codes.
  • Inspection Request Form: After completing electrical work, this form is needed to schedule an inspection to verify compliance. Much like the 81 611A, it is crucial for ensuring that all work has been performed correctly and in accordance with applicable regulations.

Dos and Don'ts

When filling out the 81 611A form for an electrical permit in the City of Philadelphia, it is essential to adhere to specific guidelines to ensure accuracy and compliance. Below is a list of dos and don'ts to facilitate this process.

  • Do complete all fields accurately to avoid delays.
  • Do print clearly to ensure legibility.
  • Do confirm that you are authorized to act on behalf of the owner.
  • Do provide a brief description of the work being proposed.
  • Don't leave any fields blank; each section must be filled out.
  • Don't submit the application without verifying the required permits and codes.
  • Don't provide inaccurate contact information for the owner or contractor.
  • Don't ignore questions related to violations; provide complete information.

Adhering to these guidelines will help streamline the review and approval process for your electrical permit application.

Misconceptions

There are several misconceptions surrounding the 81 611A form, which is essential for obtaining an electrical permit in the City of Philadelphia. Understanding these misconceptions can help ensure a smoother application process. Below are six common misunderstandings:

  • The form is only for new construction. Many believe the 81 611A form is exclusively for new construction projects. However, it also applies to alterations, rehabilitations, and other types of electrical work, like equipment replacements.
  • No contractor is required for small projects. Some people think that minor electrical jobs do not need a licensed contractor. In reality, a licensed contractor is necessary for most projects to comply with city regulations.
  • Filing the form guarantees a permit. It's a misconception that submitting the 81 611A form automatically results in a granted permit. The application must be reviewed, and compliance with regulations is mandatory before the permit can be issued.
  • The information can be submitted informally. People often believe they can casually provide their information without attention to detail. However, all information must be completed clearly and accurately for the application to be processed.
  • Only electrical engineers can fill out the form. While knowledge of electrical systems is beneficial, any authorized individual can complete the form. It is essential that the applicant certifies their understanding and authority to act on behalf of the property owner.
  • There are no penalties for false information. Some may think they can submit misleading information without consequences. It's important to note that providing false statements can lead to significant legal penalties under city law.

Clarifying these misconceptions can facilitate a better understanding of the requirements and responsibilities associated with the 81 611A form, ultimately leading to successful permit acquisition.

Key takeaways

When completing the 81 611A form for an electrical permit in Philadelphia, it is crucial to understand the following key points:

  • Complete all sections of the form thoroughly. Missing information can delay the processing time.
  • Use clear handwriting or type the information to ensure readability.
  • Provide accurate contact information for the owner and the electrical contractor to facilitate communication.
  • Clearly specify the address of the proposed construction.
  • Indicate whether the project involves new construction, addition, or renovation, as this affects the review process.
  • Include a detailed description of the planned work to help the reviewers understand the project's scope.
  • Be aware that applications submitted in response to a violation will require additional scrutiny.
  • Ensure the applicant's signature is provided along with the date to validate the application.
  • Understand that non-compliance with city ordinances may lead to penalties, including possible rejection of the application.

These elements are essential for a smooth application process and compliance with Philadelphia's regulations. Pay careful attention to each requirement to avoid complications and delays.